PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Metal decking at Derrick -2 Facing South (800x600).jpg Installing Metal decking at Derrick -2 Facing South-West (800x600).jpg Welding Derrick -2 Facing North-East (800x600).jpg Core Drilling for Conduit Facing West (800x600).jpg Damaged foundation wall at column line K-2.5 Facing West (800x600).jpg Excavation for foundation walls along column line 6.5 from G-C.7 Facing South (800x600).jpg Instaling metal decking at Derrick -2 Facing North-West (800x600).jpg Installing metal decking at Derrick -2 Facing West (800x600).jpg Installing steel angles for metal decking at Elev. 1,2,3  (2nd Floor) Facing North (800x600).jpg
Previous pageNext page Damaged foundation wall at column line K-2.5 Facing West (800x600)
Damaged foundation wall at column line K-2.5 Facing West (800x600)